The scope of this assignment concerns the Aerial inspection of the Gasunie pipelines (owned and in control) in the Netherlands. An important part of the scope is a secure HTTPS connection that needs to be build and maintained between Gasunie and contractor. The Gasunie pipelines network needs to be inspected every three weeks. The length of the pipeline network is approximately 8.000 kilometres.